milowo posted on September 12th, 2022
E.R.S. (Energy Recovery System) at Babylon Park in London ?
Yes
milowo posted on September 12th, 2022
E.R.S. (Energy Recovery System) at Babylon Park in London ?
Yes
E.R.S. (Energy Recovery System) at Babylon Park in London ?
Hey, I'm currently seeking someone to make a recreation for me, as I don't have the time to do it myself, nor the hability right now. Obviously it would be a paid service, so if someone here is willing to work on this kind of project please let me know.
Soko posted on September 10th, 2022
I doubt this is completely realistic but someone made a Wicked Twister-inspired swing launch and increased the height to 555 ft.
Okay- I doubt it too, but holy shit, that looks so cool I would LOVE to see that
Next guess:

AceDFe19 posted on September 11th, 2022
K2 at Karls Erlebnis-Dorf Elstal
Correct!
🚨One Week Warning!🚨
-Ride_Op
K2 at Karls Erlebnis-Dorf Elstal
I doubt this is completely realistic but someone made a Wicked Twister-inspired swing launch and increased the height to 555 ft.
MrRC posted on September 10th, 2022
Studio Tour @ Movie Park Germany ?
No
Maybe they could have a ground up modern overhaul with some sort of twist. Maybe the top hat will be a massive outward faced tear drop shaped top hat? Maybe they could add a couple elements at the end that interact with the tower? They could also go down the polar coaster route for breaking the 500ft barrier. Would be the last 100ft barrier for a long time and would make sure Cedar Point stays the park that breaks those first. Would be hella marketable too.
Studio Tour @ Movie Park Germany ?
Hint #1 added
walibi fou posted on September 9th, 2022
Thanks ;)
No problem
Thanks ;)
RealizeCoaster posted on September 9th, 2022
You guys need a hint?
Yes plz
It's kinda hard to speculate when there's potential arguments against whatever possible kind of change I (or others) can think of (especially if it's a facetious speculation).
I could see an LSM launch conversion happening, but if that's the main change they make, then why the "being retired" press release (since the GP probably won't care about which launch system)? Unless maybe the LSM launch is also combined with a complete retheme, rename, and repaint.
Maybe it's a good thing that it's hard to speculate since no matter what I'll ultimately be surprised.
You guys need a hint?
Support for 2 Factor Authentication. Specifically the new WebAuthn standard as well as mobile Time-based One-Time Passwords (TOTP)


